Indonesia's Yawan high-speed rail train line begins track laying

Release time:2022-04-22


Indonesia's Yawan high-speed rail train line begins track laying

Jakarta202220 AprilAfternoon14:10The route of the Yawan high-speed train in Bandung County, West Java Province, Indonesia was successfully laid.

Total length of Yawan high-speed railway142 kilometers, with a total track laying length of 279.4 kilometers. The ballasted track section is 112.8 kilometers and the ballastless track is 166.6 kilometers, all of which are 50 meters of steel rails produced in China. Domestic rails are transported to the track laying base of Yawan high-speed railway in Bandung County via domestic railways, sea transportation and railways in Indonesia. A full set of domestic equipment and advanced pulsating flash welding technology are used to weld 50 meters of rails into 500 meters of rails.

The Yawan high-speed railway isThe "Belt and Road" construction and the landmark project of pragmatic cooperation between China and Indonesia are the first model project of my country's high-speed rail system, all elements, and the entire industry chain to land overseas. After the completion of the project, the travel time from Jakarta to Bandung will be shortened from more than 3 hours to 40 minutes.

The track laying of Wuhan Jinhuasheng Railway Locomotive Co., Ltd.DF4 1295 locomotive also served as the track laying task.